European Battery Assembly

  • Homepage
  • European Battery Assembly
  • The SUNLIGHT European Battery Assembly (SEBA) located in Verona, has an overall extent of 5.900m2, it further increases the production capability in motive batteries and offers even better delivery times to SUNLIGHT Partners.

    Competitive advantages

    Facility:

    • Storage of raw materials:
      • 1,150 pallet places for Cells
      • Capacity for 50,000 items in stock
      • 1,000 pallet places for trays and accessories
    • Quality control of incoming materials: 227m2
    • Warehouse of finished products: 800m2 – 788 pallets
    • Quality control of finished products: 100m2
    • 3 loading positions
    • Special Recycling Area: 189m2

    Production:

    • Two fully functional production lines with roller conveyors and one auxiliary extra
    • 3 Pneumatic Manipulator for lifting elements and placing them in metal boxes
    • Implementation of a system for electronic monitoring and recording of production
    • Installation of quality controls for each production line and workstation via an electronic program
    • Automatic leveling system for sulfuric acid in each cell
    • Special clamping instrument for connecting the elements together
    • Prepared Aqua – Filling, special wheelchairs next to the production line
    • Electronic scale as a part of the Conveyors, along the production line
    • Printed QR code on each battery with customer order information and quality measurements

    Quality:

    • Check incoming material in an appropriate space with special measuring instruments.
    • 4 check point on the production line and electronic error recording.
    • Extra charge on each battery, for immediate use.
    • Final inspection in specialized space by qualified staff on each battery.